Site: Intermodal Terminal in North Central Planning Region of Bulgaria - Ruse
Preliminary Research and Design, Technical specifications.

Contractor: Eurotransproject Ltd.

Accomplished in: Nov 2015

Site: Modernisation of the Railway Section Sofia - Stolnik, part of Sofia Railway Junction.
Stage I: Inquiry and Research.

Contractor: Eurotransproject Ltd.

Accomplished in: Jul 2015

Site: Railway Siding from Septemvri Station to Plot 221 of the land of Varvara Village.
Preliminary Research.

Contractor: Holzindustrie Schweighofer Ltd.

Accomplished in: Jun 2015

Site: Lot #2 Railway track Pazardjik - Stambolijski.
Technical and Detiled Design

Contractor: Eurotransproject Ltd.

Accomplished in: Dec 2014

Site: Technical Assistance for Modernization of Radomir - Blagoevgrad Railway Line. Preliminary Research and Design.

Contractor: National Railway Infrastructure Company (NRIC)

Accomplished in: Nov 2014

Site: Reconstruction and Electrification of Railway Line Plovdiv - Svilengrad. Section Dimitrovgrad - Nova nadejda - Konstantinovo

Contractor: Eurotransproject Ltd.

Accomplished in: Jun 2013

Site: Renewal of the Railway Section Tserkovski – Karnobat - Burgas
Part: Railway Line

Contractor: Eurotransproject Ltd.

Accomplished in: Mar 2012

Site: Optimization of Railway Alignment Makotsevo – Dolno Kamartsi and Final Benchmarking.

Contractor: Eurotransproject Ltd.

Accomplished in: Feb 2012

Site: Mechanized Renewal of the Permanent Way in Open Track Section Raduntsi – Dubovo with Length 3503,50 meters, Repair of Steel Bridges at km 215+452 and at km 216+355 and Strengthening of Tunnels 23, 24 and 24 on the 4th Railway Line – Preliminary Design Study and Detailed Design.
Part: Railway Line and Drainage

Contractor: Eurotransproject Ltd.

Accomplished in: Dec 2011

No Image yet

Site: Creating a Cadastral Map and Cadastral Register of the Territory оf the National Railway Infrastructure Company (NRIC), along the Railway track Stolnik - Gorna Malina

Contractor: Geotechnoengineering Ltd.

Accomplished in: Oct 2011

Site: Alternative Roads and Tunnels to Allow Access Between the Southern and Northern Properties of Chelopech Mining EAD. Feasibility Study.
Part: Road and Geology

Contractor: Eurotransproject Ltd.

Accomplished in: Jun 2011

No Image yet

Site: “Lukoil Bulgaria” LTD – Reconstruction of OSB (Oil Supply Base) “Stara Zagora”, Subproject: “Road Access – Automated Level Crossing of the Burgas – Sofia Line at km 102+410 – Technical Design”.

Contractor: Neftgazengineering Ltd.

Accomplished in: Dec 2010

Site: Technical Assistance for Development of Sofia Railway Junction. Preliminary Design for Development.
Part: Railway Line

Contractor: Ministry of Transport, Information Technology and Communications

Accomplished in: Dec 2010

Site: Refurbishment of the Railway Siding Located on the Company Site of Chelopech Mining EAD and Construction of a Concentrate/Goods Handling Facility. Feasibility Study.

Contractor: Eurotransproject Ltd.

Accomplished in: Dec 2010

Site: Technical Assistance for Development of Burgas Railway Junction. Preinvestment Research and Options for Development. Preliminary Design.

Contractor: Ministry of Transport, Information Technology and Communications

Accomplished in: Dec 2010

Site: Creating a Cadastral Map and Cadastral Register of the Territory of the Nadezhda District – Sofia Municipality
Stage I: Elaboration of Cadastral Maps and Register for Nadezhda-1 District, Sofia – EKATTE (Unified Classification of Administrative-territorial and Territorial units) 68134
Stage II: Tachimetric Imaging of Nadezhda-3 District, Sofia, EKATTE 68134

Contractor: Geotechnoengineering Ltd.

Accomplished in: Sep 2010

Site: Technical Assistance for the Restoration of the Design Parameters of the Railway Line Ruse–Varna Stage IV Rehabilitation of the Ruse-Varna Railway. Investment Project
Part: Railway Line.

Contractor: Eurotransproject Ltd.

Accomplished in: Jun 2010

Site: Technical Assistance for the Modernisation of the Vidin-Sofia Railway Line. Stage II,
Part: Railway Line

Contractor: Transsystem Ltd.

Accomplished in: Feb 2010

Site: Technical Assistance for Renovation and Reconruction of Railway Section Plovdiv - Michailovo: Stage II
Task 1: Technical Design and Technical Specifications for Implementation of Activities for the Rehabilitation of the Railway in the Skutare – Orizovo Section.
Part: Railway Line

Contractor: Ministry of Transport, Information Technology and Communications

Accomplished in: Jan 2010

No Image yet

Site: Tram Connection from Lulin District to Overpass Nadezhda Along the Alignment Pancho Vladigerov blvd. – Vruh Mancho str. – Kukush str. – Mayor Vekilski str. – Skopje blvd.
Subprobject: Temporary Railway Variant at Road Underpass at km 1+959 in the Open Track Section Sofia – Zaharna Fabrika. Preliminary Design
Part: Railway Line

Contractor: Sofiaproject

Accomplished in: Nov 2009

No Image yet

Site: Level Crossing and Railway Stops at km 7+280 in the Open Track Section Filipovo – Suedinenie Along 81st Railway Line, in Compliance with the Design of Roundabout – Road Connection Plovdiv-AM“Trakiya” /Junction West/
Subproject: Railway Infrastructure;
Phase: Technical design

Contractor: Sensor - S Ltd.

Accomplished in: Oct 2009

No Image yet

Site: Plan for Regulating and Construction of Hadzhi Dimitar District
Part: Development of Railway Infrastructure;
Phase: Preliminary Design;

Contractor: Architecture and Urban Spatial Development Service - Sofia

Accomplished in: Jul 2009

No Image yet

Site: Construction of Level Crossing at km 9+100 in Open Track Section Birimirtsi – Poduene Distribution Station and Mimi Balkanska str.
Part: Railway Line, Crossing-operator Building, Health and Safety Plan and Signaling and Communications

Contractor: Sofiaproject

Accomplished in: Jun 2009

Site: Leveling Line №14 from ELB (Elevated Leveling Benchmark) №4 to ELB №1 Ruse – Kalipetrovo Village, Leveling Range VI

Contractor: Eurotransproject Group POCA

Accomplished in: Jun 2009

Site: General Repair of Tunnel №3 in Open Track Section Dolno Kamartsi – Mirkovo Along the Sofia-Karlovo-Zimnitsa Railway Line. Survey and Design.
Part: Railway Line and Geodesy

Contractor: Eurotransproject Ltd.

Accomplished in: Jun 2009

No Image yet

Site: Elaboration of Detailed Design and Bill of Quantities for Project: “Agropolychim” – Devnya. Threatment Plant for Waste Waters.
Subproject: Crossing of Double Railway Line Sofia – Varna at km 520+840 with Reinforced Concrete Pipe Ø1000

Contractor: Geoproject Ltd.

Accomplished in: Mar 2009

Site: City of Letnitsa – "Industrial park" AD, Letnitsa Municipality
Subproject: Road Network and Infrastructure;
Part: Railway Line;

Contractor: Ecoproject Ltd.

Accomplished in: Feb 2009

Site: Change of General Development Plan of Sofia and Sofia region
Part: Railway transport;

Contractor: Sofproekt – Mastyer Urban Spatial Development Plan

Accomplished in: Jan 2009

No Image yet

Site: METRO Cash and Carry - Plovdiv 2
Part: Geodetic Measurements and Control During Project Construction;

Contractor: Eurotransproject Ltd.

Accomplished in: Nov 2008

Site: Detailed Geodetic Imaging of the Technical Condition of the Railway Infrastructure in the Region of Sofia Central Station
Part: Geodesy;

Contractor: Eurotransproject Ltd.

Accomplished in: Nov 2008

No Image yet

Site: METRO Cash and Carry - Burgas - reconstruction Part:
Geodesy

Contractor: METRO Cash & Carry Bulgaria

Accomplished in: Nov 2008

No Image yet

Site: METRO Cash and Carry - Pleven
Part: Geodetic Measurements and Control During Project Construction;

Contractor: METRO Cash & Carry Bulgaria

Accomplished in: Oct 2008

No Image yet

Site: Regulation and Development Plan of Severen Park District, Cemetery Park “Bakurena Fabrika”
Subproject: New Railway Station Obelya;

Contractor: Architecture and Urban Spatial Development Service - Sofia

Accomplished in: Oct 2008

No Image yet

Site: METRO Cash and Carry - Sofia 1, Reconstruction
Part: Geodetic Measurements and Control During Project Construction;

Contractor: METRO Cash & Carry Bulgaria

Accomplished in: Sep 2008

No Image yet

Site: Reconstruction and Electrification of Railway Line Plovdiv-Svilengrad-Turkish/Greek Border and Optimization of the Alignment for 160 km/h.
Phase 2: Purvomai – Turkish Border. Actualization of the Property Evaluations on the Territory of Simeonovgrad for Land Planned for Forced Expropriation;

Contractor: National Railway Infrastructure Company (NRIC)

Accomplished in: Jul 2008

No Image yet

Site: Industrial railway branch of production base Liebherr, town of Plovdiv

Contractor: Eurotransproject Ltd.

Accomplished in: Jun 2008

No Image yet

Site: Gasification of THP (Temporary Heating Plant) “Suha Reka"
Part: Geodesy

Contractor: Technoterm Engineering Ltd.

Accomplished in: Jun 2008

No Image yet

Site: Gasification of THP (Temporary Heating Plant) “Levski G”
Part: Geodesy;

Contractor: Technoterm Engineering Ltd.

Accomplished in: Jun 2008

No Image yet

Site: Gasification of THP (Temporary Heating Plant) “Hadzhi Dimitar”
Part: Geodesy

Contractor: Technoterm Engineering Ltd.

Accomplished in: Jun 2008

No Image yet

Site: METRO Cash and Carry - Varna, Reconstruction
Part: Geodetic Measurements and Control During Project Construction;

Contractor: METRO Cash & Carry Bulgaria

Accomplished in: May 2008

No Image yet

Site: METRO Cash and Carry – Veliko Tarnovo
Geodetic Measurements and Control During Project Construction

Contractor: METRO Cash & Carry Bulgaria

Accomplished in: May 2008

No Image yet

Site: Construction of Road Connection Between Kniaginia Maria Luisa blvd. and 202-ra str., Western Reception Building of Sofia Central Station. - Preliminary Design;

Contractor: Eurotransproject Ltd.

Accomplished in: May 2008

No Image yet

Site: Pre-investment Study for Project: Doubling of Electrification of the Karnobat – Sindel Railway Line.
Part: Road (Road access and parking) and Railway Line

Contractor: Eurotransproject Ltd.

Accomplished in: Mar 2008

No Image yet

Site: Project: Retail and Leisure Centre - Sofia "202" blvd, "Zadgarova Arteria".
Subproject: Pedestrian and vehicular accesses from Sofia Central Railway and Bus Station to the Buildi.
Feasibility Study;

Contractor: Eurotransproject Ltd.

Accomplished in: Feb 2008

No Image yet

Site: Reconstruction of switches area, Thompson station - Direction Svoge.
Part: Geodesy

Contractor: Eurotransproject Ltd.

Accomplished in: Dec 2007

No Image yet

Site: Evaluation of Forcedly Expropriated Properties on the Territory of Simeonovgrad Municipality in Connection with the Elaboration of Project: “Reconstruction and Electrification of Railway Line Plovdiv – Svilengrad – Turkish/Greek Border and Optimization of the Alignment for Speed 160 km/h. Phase 2: Parvomai – Turkish Border"

Contractor: National Railway Infrastructure Company (NRIC)

Accomplished in: Dec 2007

No Image yet

Site: Increase of the Traffic Capacity by Improvement of the Parameters of the Permanent Way and Increasing the Design Speeds of the Sofia – Karlovo Railway Line.
Section: Iliyantsi - Dolno Kamartsi.

Contractor: Eurotransproject Ltd.

Accomplished in: Oct 2007

No Image yet

Site: Retail and Leisure Centre RIOFISA - Sofia.
Part: Geodesy,

Contractor: Transgeo Ltd.

Accomplished in: Mar 2007

No Image yet

Site: Terminal for Filling Tank Trucks Burgas – Neftohim
Part: Vertical layout
Technical design;

Contractor: Gus Ltd.

Accomplished in: Mar 2007

No Image yet

Site: Work Landing/Site for the Dendrit Ltd Company in Gorna Banya District, Sofia
Part: Geodesy;

Contractor: Dendrit Ltd.

Accomplished in: Mar 2007

No Image yet

Site: Road Underpass at km 51+120 of the Razmenna – Pernik Distribution Station Railway Line. Reconstruction of the Road to Increase the Clearance Height of the Underpass.
Part: Constructive and Roads
Preliminary design;

Contractor: Recoal JSC - Pernik

Accomplished in: Mar 2007

No Image yet

Site: Design, Construction and Testing of an Expansion of the Sofia Metro
Design: Connector “Dragan Tsankov” Part: Geodesy

Contractor: Geoproject Ltd.

Accomplished in: Jan 2007

No Image yet

Site: METRO Cash and Carry – Blagoevgrad
Geodetic works during construction

Contractor: METRO Cash & Carry Bulgaria

Accomplished in: Nov 2006

No Image yet

Site: Laying of Asphalt Along Main Alignments /Ring and Radial/, Carrying Mass Urban Transport and Included in the Projects Draft of Sofia Municipality for 2006.
Subproject: 202-nd str. From Overpass “Nadezhda” to “Kamenodelska” str.
Part: Roads – Detailed Design

Contractor: Sofiaproject

Accomplished in: Aug 2006

No Image yet

Site: Repair Works of the Road Surface Along P. Yavorov blvd in the Section from Sitnyakovo blvd. to Stoyan Mihailovski blvd.
Part: Roads and Temporary Traffic Organization. Detailed Design

Contractor: Sofiaproject

Accomplished in: May 2006

No Image yet

Site: Reconstruction of Opalchenska Street from Maria Luisa Boulevard to Slivnica Boulevard.
Part: Geodesy

Contractor: Sofiaproject

Accomplished in: Apr 2006

No Image yet

Site: Warehouses for Light Fuels and Propane-Butane. Crossing of Tracks at Yana Station and “Redki Metali” with New Canalization.
Detailed design.

Contractor: Opet/Aygaz Bulgaria EAD

Accomplished in: Apr 2006

No Image yet

Site: METRO Cash and Carry – Sofia-1. Enlargement-2.
Geodetic works during construction.

Contractor: METRO Cash & Carry Bulgaria

Accomplished in: Mar 2006

No Image yet

Site: General Development Plan Plovdiv, Railway Transport in Plovdiv Municipality and the Zone for Active Impact on the City – 2005. Tendencies for Development of Railway Junction Plovdiv.

Contractor: Cityplan Ltd.

Accomplished in: Jan 2006

No Image yet

Site: Geodetic Imaging in Layout and Level of the Undercrane Roads at Locomotive Depot Sofia.

Contractor: National Railway Infrastructure Company (NRIC)

Accomplished in: Nov 2005

No Image yet

Site: METRO Cash and Carry – Sofia 1 - Extension/Outbuilding Shelter.
Part: : Vertical Planning

Contractor: METRO Cash & Carry Bulgaria

Accomplished in: Nov 2005

No Image yet

Site: Recovery and Strengthening of Leaking Embankment at km 40+200 in the Open Track Section Svoge – Bov Road №1
Part: Strengthening and Draining of the Ground Bed;
Part: Superstructure;

Contractor: Transsystem Ltd.

Accomplished in: Sep 2005

No Image yet

Site: General Development Plan of NPZ “Iskar – Sever”
Part: Railway transport

Contractor: Eurotransproject Ltd.

Accomplished in: Aug 2005

No Image yet

Site: METRO Cash and Carry – Stara Zagora
Subproject: Reorganization of Live Fish Sector.
Part: Geodetic Measurements and Control During Project Construction.

Contractor: METRO Cash & Carry Bulgaria

Accomplished in: Jun 2005

No Image yet

Site: METRO Cash and Carry - Sofia-1
Subproject: Storage Space for Construction Materials;
Geodetic Measurements and Control During Project Construction.

Contractor: METRO Cash & Carry Bulgaria

Accomplished in: Jun 2005

No Image yet

Site: Warehouse Base with Administrative Part.
Zoned Property I 261, distr. 1, Botevgradsko Shose blvd., “Vrazhdebna – Stopanski Dvor” – Surfaces (Pavements).

Contractor: Eurotransproject Ltd.

Accomplished in: May 2005

No Image yet

Site: Danube Bridge – Railway Infrastructure.
Evaluation of the Design’s Compliance.

Contractor: Eurotransproject Ltd.

Accomplished in: Jan 2005

Site: Sofia Airport, New Passenger Terminal.
Geodetic Measurements During Carrying Out the Earthworks for the Project.

Contractor: Miks - PS Ltd.

Accomplished in: Dec 2004

No Image yet

Site: Reconstruction of Existing Railway Track of “Manti Co” Ltd and Construction of Railway Divergence Towards It in Industrial Zone – Iskar Station
Part: Track Development

Contractor: Manti Co Ltd.

Accomplished in: Nov 2004

No Image yet

Site: Project Bid - Plovdiv - Svilengrad Railway.
Electrification and Upgrading of Corridors IV and IX in Section: Kroumovo-Parvomai

Contractor: Gus Ltd.

Accomplished in: Oct 2004

No Image yet

Site: Elaboration of Plans for Underground Communications, Imaged During the Construction of the Sites of METRO Cash & Carry – Bulgaria
Part: Geodesy;

Contractor: METRO Cash & Carry Bulgaria

Accomplished in: Oct 2004

No Image yet

Site: Change in the Working General Development Plan of the Town of Ruse.
Part: Railway infrastructure;

Contractor: Bulplan Ltd.

Accomplished in: Jun 2004

No Image yet

Site: METRO Cash and Carry - Reconstruction of department "Fish" for:
- Sofia-1 (Mladost);
- Sofia-2 (Bozhurishte);
- Plovdiv;
- Varna;
Geodetic Measurements and Control During Project Construction.

Contractor: METRO Cash & Carry Bulgaria

Accomplished in: Apr 2004

No Image yet

Site: Detailed Design: Actualization of the Design Solution for Implementation of Shore Strengthening Along the Existing Partial Earth-embankment Dike in the Scope of Project; Construction of Winter Landing / Dock for 39 River Vessels, Sailing the Danube – Stage III.".
Part: Road and vertical planning;

Contractor: Interplan Ltd.

Accomplished in: Mar 2004

No Image yet

Site: Construction of New Railway Track Towards Plot № 771 in the North Industrial Zone – II Part, Filipovo Station.
Part: Track Development;

Contractor: SD Ekip 2000

Accomplished in: Feb 2004

No Image yet

Site: Reconstruction and Electrification of Railway Line Plovdiv – Svilengrad – Turkish/Greek Border and Optimization for Speed 160km/h.

Contractor: Transsystem Ltd.

Accomplished in: Sep 2003

No Image yet

Site: Technical Design for Greenery House 12 acres – Simitli
Part: Geodesy

Contractor: Visser Opora Ltd.

Accomplished in: Sep 2003

No Image yet

Site: Elaboration of Detailed Design – Pedestrian Bridge Over the Drenovichka River in South Park Part III – Sofia
Parts: Architecture, Constructive, Geodesy, Geology and Park Development

Contractor: Bigla-3 Ltd.

Accomplished in: Dec 2002

No Image yet

Site: Detailed Design – Documentation for Coordination – Winter Docking for CMWSD /Control for Maintenance of the Waterway and Study of Danube/ - Ruse at km 491 of the Danube River.
Part: Vertical Planning and Communal Road

Contractor: Interplan Ltd.

Accomplished in: Nov 2002

No Image yet

Site: METRO Cash and Carry - Burgas
Geodetic Measurements and Control During Project Construction.

Contractor: METRO Cash & Carry Bulgaria

Accomplished in: Mar 2002

No Image yet

Site: Border Roads Towards Greece.
Section: E-80/85 Purvomai – Svilengrad.
Overpass Over Railway Line Dimitrovgrad – Haskovo at km 305+614. Subproject: Shift of Railway Line Dimitrovgrad – Haskovo from km 21+400 to km 22+200

Contractor: Rutex Ltd.

Accomplished in: Dec 2001

No Image yet

Site: Intermodal Container Terminal Sofia – Kazichene.
Part: Railway Transport.

Contractor: Stalker KM Ltd.

Accomplished in: Aug 2001

No Image yet

Site: Electrification and Reconstruction of Corridor IV and X – Phase 1.

Contractor: Parsons Brinckerhoff / RTN

Accomplished in: May 2001

No Image yet

Site: Reconstruction and Electrification of Railway Line Dupnitsa – Kulata Subproject: Reconstruction of the General Todorov Station – Switch Area Side Kulata Part: Track Development

Contractor: Glavbolgarstoy

Accomplished in: Mar 2001

No Image yet

Site: General Development Plan of the Town of Bankya
Part: Railway Transport;

Contractor: Sofproekt – Mastyer Urban Spatial Development Plan

Accomplished in: Mar 2001

No Image yet

Site: METRO Cash and Carry - Stara Zagora
Geodetic Measurements and Control During Project Construction.

Contractor: METRO Cash & Carry Bulgaria

Accomplished in: Oct 2000

No Image yet

Site: METRO Cash and Carry - Stara Zagora.
Subproject: Reconstruction of Road Bridge over Irrigation Canal.

Contractor: METRO Cash & Carry Bulgaria

Accomplished in: Aug 2000

No Image yet

Site: Reconstruction and Electrification of the Railway Line Dupnitsa – Kulata, Railway Station Gen. Todorov Part: Geodetic Image

Contractor: Glavbolgarstoy

Accomplished in: Jun 2000

No Image yet

Site: BILLA Supermarket-Slaviya - Sofia

Contractor: Miks - PS Ltd.

Accomplished in: May 2000

No Image yet

Site: METRO Cash and Carry - Varna
Geodetic Measurements and Control During Project Construction.

Contractor: METRO Cash & Carry Bulgaria

Accomplished in: Mar 2000

No Image yet

Site: METRO Cash and Carry - Sofia-2 (Bozhurishte)
Geodetic Measurements and Control During Project Construction.

Contractor: METRO Cash & Carry Bulgaria

Accomplished in: Mar 2000

No Image yet

Site: General City-development Plan – Sofia. Prognosis for Social-economic and Spatial Development. Part: Prognosis and Guidelines for Development of the Railway Transport.

Contractor: Sofproekt – Mastyer Urban Spatial Development Plan

Accomplished in: Dec 1999

No Image yet

Site: METRO Cash and Carry - Ruse
Geodetic Measurements and Control During Project Construction.

Contractor: METRO Cash & Carry Bulgaria

Accomplished in: Oct 1999

No Image yet

Site: METRO Cash and Carry - Plovdiv-1
Geodetic Measurements and Control During Project Construction.

Contractor: METRO Cash & Carry Bulgaria

Accomplished in: Mar 1999

No Image yet

Site: METRO Cash and Carry - Sofia-1 (Mladost)
Geodetic Measurements and Control During Project Construction.

Contractor: METRO Cash & Carry Bulgaria

Accomplished in: Mar 1999

No Image yet

Site: Town of Sofia – in the Area of “Pioner Station”
Part: Railway Transport

Contractor: Sofproekt – Mastyer Urban Spatial Development Plan

Accomplished in: Dec 1998

No Image yet

Site: Railway Track with Loading-unloading Platform for “Tonet” LTD

Contractor: PPM AD

Accomplished in: Nov 1998

No Image yet

Site: Warehouse and Production Zone Slatina – South.
Part: Railway Transport

Contractor: Architecture and Urban Spatial Development Directorate

Accomplished in: Oct 1998

No Image yet

Site: Road Connection Between North and South Platforms of “BIMAK” AD – Chelopech Village.

Contractor: Bimac AD

Accomplished in: Jul 1998

No Image yet

Site: Construction of New Hypermarket for METRO Cash and Carry – City of Sofia. Determining the Quantity of the Earthworks

Contractor: METRO Cash & Carry Bulgaria

Accomplished in: Jun 1998

Top

Accomplishment:

Choose projects

© 1998 - 2023 · Railway design by Traps
Privacy Policy
LRQA ISO 9001, ISO 14001, ISO 45001 and UKAS